Table 2

High rates of return estimated by Heintz (2010) confirmed: Error correction model of determinants of U.S. private sector productivity, various time-periods

1949-2015 1949-2007 1959-2015 1979-2015
Variables
Levels (potential cointegrating relationships)
Output/capital ratio, lagged -0.202 -0.221 -0.207 -0.272
[3.14]*** [2.97]*** [2.61]** [3.91]***
Private capital stock, lagged -0.46 -0.536 -0.549 -0.257
[4.46]*** [4.21]*** [3.82]*** [2.26]**
Labor force, lagged 0.407 0.394 0.391 0.411
[5.81]*** [5.10]*** [4.49]*** [5.82]***
Public capital stock, lagged 0.147 0.16 0.204 0.092
[3.95]*** [3.83]*** [3.27]*** [0.82]
First-differences -1.165 -1.163 -1.19 -0.864
Private capital stock [6.60]*** [5.94]*** [5.00]*** [4.24]***
0.857 0.835 0.829 0.785
Labor force [19.03]*** [16.48]*** [13.57]*** [14.47]***
0.546 0.351 0.518 0.032
Public capital stock [3.72]*** [1.83]* [1.94]* [0.12]
0.004 0.006 0.005
Time-trend yes yes yes yes
R-squared, adj 0.9 0.88 0.86 0.91
N 66 57 56 36
Economic Policy Institute

Notes: Dependent variable is the change in private sector productivity, measured as the ratio of private sector output to private sector capital stock. Data and methods discussed in technical appendix. T-statistics are in parentheses and asterisks denote statistical significance.

Copy the code below to embed this chart on your website.

This chart appears in:

Previous chart: «

Next chart: »